top of page
new.png

EVS8820

Integrated Voice Alarm Controller Extension (Slave)

Extends EVM8810 beyond 8 zones, adding up to 16 or 24 zones with multiple units for larger BGM and voice evacuation systems. Comes with built-in 1000W Class D amplifier. 

Priority override / changeover which ensures EVAC announcements come first

4 EVAC message memory bank

Auto Amplifier Fault Sensor (AFS) with built-in standby amplifier changeover

All Call relay trigger for remote or front panel activation

  • Introduction

    The all-new EVS8820 Integrated Voice Alarm Controller now features a redundant 24V DC backup power supply for enhanced system reliability during mains power failure. Designed as an extension unit for the EVM8810 Master Controller, it seamlessly expands the voice alarm system beyond the EVM8810's built-in 8 speaker zones.


    Each EVS8820E adds 8 additional speaker zones, allowing the system to support up to 16 zones with one extension unit, or up to 24 zones with two EVS8820E units. This scalable architecture provides a cost-effective and flexible solution for larger BGM and voice evacuation (EVAC) installations while maintaining centralized system control.

    Packing information

    • Carton size: 555 (L) x 555 (W) x 195 (H) mm​

    • Gross weight: 11.05 kg

    • Net weight: 9.10 kg

    • 1 unit per carton


  • EVS8820

    Power Requirements


    Power supply

    220 - 240V AC, 50/60 Hz OR 24 - 30V DC backup supply (NEW)

    Power rating

    1000W at 100V line output

    Power consumption (240V AC)

    Full load: 1500VA (6.1A)

    Standby: 0.5A

    Current consumption (24V DC)

    Full load: 50A

    Standby: 1A

    Connections


    Input channels

    Backup amplifier input port (100V line in - balanced)

    Input sensitivity / impedance

    Line: 1.2V / 10k Ohm

    Input signal at standby

    Switchable auto detect / always ON

    Frequency response

    50 - 15 kHz (± 3 dB @ 1 kHz, 0 dBu)

    THD + Noise

    <1% (0.2%)

    Standby amplifier changeover

    Built-in changeover relay

    Zone output

    8 zones (front switch and remote paging with All Call)

    Audio output

    Master line output, balanced 0 dBU

    Audio link to slave unit

    Line balanced 0 dBU

    Emergency dry contact

    3A, NO relay

    Tone controls

    Bass (100 Hz), Treble (10 kHz), 15 dB slope

    Output audio monitoring

    Front speaker with volume controls

    Controls

    Input gain controls

    Data communications

    RS485, 19.2 kbps

    Cascade / link

    RJ45 port (line audio and RS485 data)

    Cascade quantity

    3 units of EVS8820 (total of 24 zones)

    Indicators

    Signal, temperature, fault, power, and zone selection

    Priority sequence (low to high)

    N/A

    Protections

    Thermal, short circuit, overload, and AC fuses

    Cooling system

    Temperature-controlled dual ventilation fan

    Cut off temperature

    75°C

    Physical Specifications


    Dimensions (W x H x D)

    482 x 88 x 420 mm

    Net weight

    9.10 kg

    Note: The specification parameters may be changed, added, or omitted without prior notice. Last updated on 28 Aug 2026.

    • Extension unit of EVM8810 Voice Alarm, Paging & BGM controller

    • Built-in 1000W 100V Class D amplifier with 8 speaker zones

    • Priority override with fire-compliant paging sequence (EN54 / BS)

    • Auto Amplifier Fault Sensor (AFS) with built-in standby amplifier changeover (monitors the amplifier circuit)

    • Front panel and remote message playback control

    • All Call relay trigger (front or remote activation)

    • Relay contacts for external volume override during emergency paging

    • Built-in monitoring speaker with adjustable volume

    • Fault dry contact output for system monitoring

    • Switchable energy-saving standby mode


    Including everything above, the new EVS8820 now features:

    • Redundant 24V DC backup power input

  • Product Catalogue

    File Type: PDF

    Version: Year 26/27

    Instruction Manual

    File Type: PDF

    Version: V1.0 (May 2024)

    CAD Drawing File (2D)

    File Type: DWG

    Version: V2 (Front & Rear)

    Declaration of Conformity (CE)

    File Type: PDF

    Version: 2024

Introduction

The all-new EVS8820 Integrated Voice Alarm Controller now features a redundant 24V DC backup power supply for enhanced system reliability during mains power failure. Designed as an extension unit for the EVM8810 Master Controller, it seamlessly expands the voice alarm system beyond the EVM8810's built-in 8 speaker zones.


Each EVS8820E adds 8 additional speaker zones, allowing the system to support up to 16 zones with one extension unit, or up to 24 zones with two EVS8820E units. This scalable architecture provides a cost-effective and flexible solution for larger BGM and voice evacuation (EVAC) installations while maintaining centralized system control.

Packing information

  • Carton size: 555 (L) x 555 (W) x 195 (H) mm​

  • Gross weight: 11.05 kg

  • Net weight: 9.10 kg

  • 1 unit per carton

Warranty Conditions & Repair services FAQ

3-year (36 months) manufacturer's warranty for eligible Amperes product containing PCBs components. Speakers, accessories, and third-party batteries are excluded. 

​

By purchasing, you agree to the warranty terms and conditions. T&Cs apply.

CROSS REFERENCES

Products that complete the system.

Power Amplifier with AFS (Class D)

Provides standby amplifier backup or additional booster power for the EVM8810 system.

Integrated Voice Alarm Controller (Master)

Master controller for EVS8820, forming an expandable Voice Alarm system of up to 24 zones.

Contact us today

Interested in this product? Contact us for more information.

Registered association members of

FMM_logo.jpg
matrade_logo.png
TEEAM_logo.png

International recognitions

ISO 9001_UKAS_URS_PDF-1.png
ce_logo.png

© 1999 - 2026 Amperes Electronics Sdn Bhd. All Rights Reserved.

Payment

paypal_icon.gif

© 1999 - 2024 Amperes Electronics Sdn Bhd. All Rights Reserved.

PayPal payment is only applicable for payment from outside of Malaysia

Sales Office (Malaysia)

70, Jalan Industri PBP 3,

Taman Perindustrian Pusat Bandar Puchong,

47100 Puchong, Selangor, Malaysia.

Tel: +603-5882 7757 / 7758

Production Factory (Malaysia)

2, Jalan Meranti Puchong D25@Meranti Puchong

47120 Puchong, Selangor, Malaysia

Export Sales Office (Singapore)

Amperes Asia Pte Ltd

(Co Reg: 201102253E)

1, North Bridge Road, #13-03, High Street Centre, Singapore 179094

amperes_logo_profile_fit_w.png

Amperes Electronics Sdn Bhd

SSM Registration No: 200001006420 (509025-X)

Your Trusted PA System Manufacturer since 1999

  • Amperes Electronics Facebook
  • Amperes Electronics LinkedIn
  • Amperes Electronics YouTube
  • Amperes Electronics Instagram
bottom of page