top of page

EVM8810

Integrated Voice Alarm Controller (Master)

All-in-one Integrated Voice Alarm Controller for EVAC, paging and BGM applications, featuring built-in 1000W 100V Class D amplifier, 8 speaker zones and message playback, mixer, media player and AFS. Now enhanced with a redundant 24V DC backup power input.

EVAC features such as emergency microphone, siren tone generator, and voice messages

Highest priority override with fire-compliant paging sequence

Auto Amplifier Fault Sensor (AFS) with built-in standby amplifier changeover

Visual FIRE indicator and built-in monitoring speaker

Introduction

Introducing the all new version EVM8810 Integrated Voice Alarm Controller, a compact all-in-one solution for EVAC, paging and BGM applications. It combines a 1000W 100V amplifier, 8 speaker zones, emergency microphone, siren generator, pre-recorded messages, mixer with tone controls and integrated media player (USB, SD/MP3, FM tuner, Bluetooth) into a compact system, reducing equipment and rack space requirements.


The system can be expanded up to 24 zones with EVS8820 extension units, while the FI6000 MK II Fire Alarm Interface enables integration with fire alarm systems for emergency message triggering. For improved system reliability, the EVM8810 now features redundant 24V DC backup power input, standby amplifier changeover with Auto Amplifier Fault Sensor (AFS), and front PTT handheld microphone disconnection/fault detection.


EVM8810 & EVS8820 are ideal for voice alarm installation that requires simplicity with limited space area for equipment but able to comply to all requirements (EN54/BS) by fire authority.

Packing information

  • Carton size: 555 (L) x 555 (W) x 230 (H) mm

  • Gross weight: 13.0 kg

  • Net weight: 10.7 kg

  • 1 unit per carton

  • Introduction

    Introducing the all new version EVM8810 Integrated Voice Alarm Controller, a compact all-in-one solution for EVAC, paging and BGM applications. It combines a 1000W 100V amplifier, 8 speaker zones, emergency microphone, siren generator, pre-recorded messages, mixer with tone controls and integrated media player (USB, SD/MP3, FM tuner, Bluetooth) into a compact system, reducing equipment and rack space requirements.


    The system can be expanded up to 24 zones with EVS8820 extension units, while the FI6000 MK II Fire Alarm Interface enables integration with fire alarm systems for emergency message triggering. For improved system reliability, the EVM8810 now features redundant 24V DC backup power input, standby amplifier changeover with Auto Amplifier Fault Sensor (AFS), and front PTT handheld microphone disconnection/fault detection.


    EVM8810 & EVS8820 are ideal for voice alarm installation that requires simplicity with limited space area for equipment but able to comply to all requirements (EN54/BS) by fire authority.

    Packing information

    • Carton size: 555 (L) x 555 (W) x 230 (H) mm

    • Gross weight: 13.0 kg

    • Net weight: 10.7 kg

    • 1 unit per carton


  • EVM8810

    Power Requirements


    Power supply

    220 - 240V AC, 50/60 Hz OR 24 - 30V DC backup supply (NEW)

    Power rating

    1000W at 100V line output

    Power consumption (240V AC)

    Full load: 1500VA (6.1A)

    Standby: 0.5A

    Current consumption (24V DC)

    Full load: 50A

    Standby: 1.2A

    Connections


    Input channels

    Ch 1 to 6 Mic/Line (balanced) RCA x 2 Dynamic handheld press-to-talk (PTT) microphone Message bank x 4 Siren PD Series paging mic ports x 2 Media Player (USB / SD Card / MP3 / FM tuner / Bluetooth) External EP1200 mic port

    Input sensitivity / impedance

    Mic: 40 mV / 10k Ohm Line: 1.2V / 10k Ohm

    Input signal at standby

    Switchable auto detect / always ON

    Frequency response

    20 - 18 kHz (± 3 dB @ 1 kHz, 0 dBU)

    THD + Noise

    <1% (0.2%)

    Standby amplifier changeover

    Built-in changeover relay

    Zone output

    8 zones (front switch and remote paging with All Call)

    Audio output

    Master line output, balanced 0 dBU

    Audio link to slave unit

    Line balanced 0 dBU

    Emergency dry contact

    3A, NO relay

    Tone controls

    Bass (100 Hz) Treble (10 kHz) 15 dB slope

    Output audio monitoring

    Front speaker with volume controls

    Controls

    Individual channels, message, siren, emergency mic, bass & treble, master volume

    Data communications

    RS485, 19.2 kbps

    Cascade / link

    RJ45 port (line audio and RS485 data)

    Cascade quantity

    3 units of EVS8820 (total of 24 zones)

    Indicators

    Signal, temperature, fault, power, message, PTT mic fault and zone selection

    Priority sequence (low to high)

    BGM, paging mic, siren, message, external EP mic, handheld PTT mic

    Protections

    Thermal, short circuit, overload, and AC fuses

    Cooling system

    Temperature-controlled dual ventilation fan

    Cut off temperature

    75°C

    Physical Specifications


    Dimensions (W x H x D)

    482 x 132 x 420 mm

    Net weight

    10.7 kg

    Gross weight

    13.0 kg

    Note: The specification parameters may be changed, added, or omitted without prior notice. Last updated on 17 Aug 2026.

    • All-in-one integrated Voice Alarm Controller for EVAC, Paging & BGM

    • Built-in 1000W 100V Class D amplifier with 8 speaker zones

    • Complete EVAC features with emergency microphone, siren tone generator, and voice message (4 message memory bank)

    • 8 audio inputs (6 Mic/Line + 2 RCA) with tone control (Bass & Treble)

    • Highest priority override with fire-compliant paging sequence (EN54 / BS)

    • Auto Amplifier Fault Sensor (AFS) with built-in standby amplifier changeover (monitors the amplifier circuit)

    • Auto muting with adjustable ducking for paging over BGM

    • Built-in media player (USB, SD/MP3, FM tuner, Bluetooth)

    • Front panel and remote message playback control

    • All Call relay trigger (front or remote activation)

    • Relay contacts for external volume override during emergency paging

    • Visual FIRE indicator and built-in monitoring speaker

    • Fault dry contact output for system monitoring

    • Switchable energy-saving standby mode

    • Supports Amperes PD Series (PD1240, PD1280, PD1900) paging microphones, PT1801 MK II, FI6000 MK II, EP1200

    • Flexible addressing for integration with existing Amperes PA systems

    • Cascadable to 24 zones for larger setup (via EVS8820 or TD6400)

    • Zone expansion via TD6400 when using a single EVM8810, without requiring EVS8820


    Including everything above, the new EVM8810 now features:

    • Redundant 24V DC backup power input

    • Advanced front press-to-talk (PTT) dynamic handheld microphone disconnection/ fault alert

  • Product Catalogue

    File Type: PDF

    Version: Year 26/27

    Instruction Manual

    File Type: PDF

    Version: V2.0 (Aug 2026)

    CAD Drawing File (2D)

    File Type: DWG

    Version: V2 (Front & Rear)

    Declaration of Conformity (CE)

    File Type: PDF

    Version: 2024

Warranty Conditions & Repair services FAQ

3-year (36 months) manufacturer's warranty for eligible Amperes product containing PCBs components. Speakers, accessories, and third-party batteries are excluded. 

​

By purchasing, you agree to the warranty terms and conditions. T&Cs apply.

CROSS REFERENCES

Products that complete the system.

Integrated Voice Alarm Controller Extension (Slave)

Adds 8 additional zones to expand the EVM8810 system up to 24 zones.

Fire Alarm Interface

Interfaces EVM8810 with the fire alarm system for automatic EVAC message and zone triggering.

Emergency Paging Microphone Panel (Rack Mount)`

Provides a remote emergency microphone and siren control for the EVM8810 system.

PD Series Paging Mics

Provides remote zone paging and All Call control for the EVM8810 system.

Power Amplifier with AFS (Class D)

Provides standby amplifier backup or additional booster power for the EVM8810 system.

Mic Extender

Expands paging microphone connections when more than two paging microphones are required.

PD Series Paging Mic Data Zone Decoder / Zone Selector / Matrix Expander

Extends EVM8810 beyond 8 speaker zones when the total system load remains within the amplifier capacity.

Contact us today

Interested in this product? Contact us for more information.

Registered association members of

FMM_logo.jpg
matrade_logo.png
TEEAM_logo.png

International recognitions

ISO 9001_UKAS_URS_PDF-1.png
ce_logo.png

© 1999 - 2026 Amperes Electronics Sdn Bhd. All Rights Reserved.

Payment

paypal_icon.gif

© 1999 - 2024 Amperes Electronics Sdn Bhd. All Rights Reserved.

PayPal payment is only applicable for payment from outside of Malaysia

Sales Office (Malaysia)

70, Jalan Industri PBP 3,

Taman Perindustrian Pusat Bandar Puchong,

47100 Puchong, Selangor, Malaysia.

Tel: +603-5882 7757 / 7758

Production Factory (Malaysia)

2, Jalan Meranti Puchong D25@Meranti Puchong

47120 Puchong, Selangor, Malaysia

Export Sales Office (Singapore)

Amperes Asia Pte Ltd

(Co Reg: 201102253E)

1, North Bridge Road, #13-03, High Street Centre, Singapore 179094

amperes_logo_profile_fit_w.png

Amperes Electronics Sdn Bhd

SSM Registration No: 200001006420 (509025-X)

Your Trusted PA System Manufacturer since 1999

  • Amperes Electronics Facebook
  • Amperes Electronics LinkedIn
  • Amperes Electronics YouTube
  • Amperes Electronics Instagram
bottom of page